Location: Cheney, WA
Tenant: Eastern Washington University
The Computing and Engineering Building was built in 2005 and includes Thermal Mechanics and Fluid Dynamics labs as well as Cyber Security, Software, and Visual Communications. The Alerton building automation system is used for the Mechanical Engineering teaching lab in addition to controlling the building.